This advice is intended to explain the generic aspects of the public bodies involvement with the applicant and the Planning Inspectorate during the Nationally Significant Infrastructure Project (NSIP) process.
Adapted edition
Resource type Reference Guide
Format DOCX
Pages 6
Language English
Updated 2026-09-17 Description This advice is intended to explain the generic aspects of the public bodies involvement with the applicant and the Planning Inspectorate during the Nationally Significant Infrastructure Project (NSIP) process. Consult the original guidance for current legal and operational details.
Contents Introduction The functions of the MMO The geographical extent of MMO responsibilities The Planning Act 2008 regime The MMO's roles under the 2008 Act regime The 2008 Act regime - the MMO as statutory consultee and interested party The MMO as a consenting body Marine licences Harbour provisions Environmental impact assessment (EIA) Nature conservation provisions Relevant guidance and advice MMO contact details Sources Nationally Significant Infrastructure Projects - Advice on working with public bodies in the infrastructure planning process, Annex B: - Marine Management Organisation Planning Inspectorate
Attribution Planning Inspectorate, ‘Nationally Significant Infrastructure Projects - Advice on working with public bodies in the infrastructure planning process, Annex B: - Marine Management Organisation’ (updated 19 August 2026), reused under the Open Government Licence v3.0.
Changes Neutral text-only adaptation from the official GOV.UK Content API body: headings, paragraphs, ordered and unordered list items and clickable source-link destinations in an appendix preserved. Images, logos, page design, accessible-format request widgets and linked attachments excluded; normalised whitespace, invisible format marks and typography.
Report this resource