This advice is intended to explain the generic aspects of the public bodies involvement with the applicant and the Planning Inspectorate during the Nationally Significant Infrastructure Project (NSIP) process.
Adapted edition
Resource type Reference Guide
Format DOCX
Pages 5
Language English
Updated 2026-09-17 Description This advice is intended to explain the generic aspects of the public bodies involvement with the applicant and the Planning Inspectorate during the Nationally Significant Infrastructure Project (NSIP) process. Consult the original guidance for current legal and operational details.
Contents Introduction The role of ONR, EA and NRW as nuclear regulators ONR EA (England) and NRW (Wales) The Roles of ONR, EA and NRW under the Planning Act 2008 (as amended) As prescribed consultation bodies under the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 As prescribed consultees under section 42 of the 2008 Act As statutory parties under s.88 of the 2008 Act As interested parties during the examination ONR Contact Details EA Contact Details NRW Contact Details Planning Inspectorate Contact Details Sources Nationally Significant Infrastructure Projects - Advice on working with public bodies in the infrastructure planning process - Annex F: Nuclear Regulators Planning Inspectorate
Attribution Planning Inspectorate, ‘Nationally Significant Infrastructure Projects - Advice on working with public bodies in the infrastructure planning process - Annex F: Nuclear Regulators’ (updated 19 August 2026), reused under the Open Government Licence v3.0.
Changes Neutral text-only adaptation from the official GOV.UK Content API body: headings, paragraphs, ordered and unordered list items and clickable source-link destinations in an appendix preserved. Images, logos, page design, accessible-format request widgets and linked attachments excluded; normalised whitespace, invisible format marks and typography.
Report this resource