Nationally Significant Infrastructure Projects - Advice on working with public bodies in the infrastructure planning process - Annex F: Nuclear Regulators

Document preview5 pages
Cover of Nationally Significant Infrastructure Projects - Advice on working with public bodies in the infrastructure planning process - Annex F: Nuclear Regulators
Page 1 of 5

Download this document free

Get this document with your free trial. Choose from the full Complyzard library.

Try 1 month free30 days free, then $19/month. Trial terms apply. Card required. Cancel anytime.
Document information

This advice is intended to explain the generic aspects of the public bodies involvement with the applicant and the Planning Inspectorate during the Nationally Significant Infrastructure Project (NSIP) process.

Adapted edition

Document type
Reference Guide
Format
DOCX
Pages
5
Language
English
Version
1.0
Updated
2026-09-17
Description

This advice is intended to explain the generic aspects of the public bodies involvement with the applicant and the Planning Inspectorate during the Nationally Significant Infrastructure Project (NSIP) process. Consult the original guidance for current legal and operational details.

Contents
  • Introduction
  • The role of ONR, EA and NRW as nuclear regulators
  • ONR
  • EA (England) and NRW (Wales)
  • The Roles of ONR, EA and NRW under the Planning Act 2008 (as amended)
  • As prescribed consultation bodies under the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
  • As prescribed consultees under section 42 of the 2008 Act
  • As statutory parties under s.88 of the 2008 Act
  • As interested parties during the examination
  • ONR Contact Details
  • EA Contact Details
  • NRW Contact Details
  • Planning Inspectorate Contact Details
Source and licence
Nationally Significant Infrastructure Projects - Advice on working with public bodies in the infrastructure planning process - Annex F: Nuclear Regulators

Planning Inspectorate

AttributionPlanning Inspectorate, ‘Nationally Significant Infrastructure Projects - Advice on working with public bodies in the infrastructure planning process - Annex F: Nuclear Regulators’ (updated 19 August 2026), reused under the Open Government Licence v3.0.

ChangesNeutral text-only adaptation from the official GOV.UK Content API body: headings, paragraphs, ordered and unordered list items and clickable source-link destinations in an appendix preserved. Images, logos, page design, accessible-format request widgets and linked attachments excluded; normalised whitespace, invisible format marks and typography.

Version history
  • v1.017/09/2026
Report this document